Guide
Free plant maintenance log template for construction equipment (Excel)
Updated 07.11.2026
This free Excel template works as a maintenance log for a construction equipment fleet: one sheet for the list of machines, another for every job, with hour meter readings and costs. Download it without signing up, fill it in by hand, and import it as it is into Godet when a spreadsheet is no longer enough.
What the Excel template contains
The .xlsx file has two sheets. The ‘Machines’ sheet lists the fleet, one row per machine. The ‘Logbook’ sheet holds the history, one row per job: service, repair, safety check, part replaced or a simple note. The machine code links the two sheets.
The first row of each sheet holds the column headings, on a yellow background. The second is an example to overwrite with your own data. The file opens in Excel, LibreOffice Calc, Numbers or Google Sheets. The headings are in the language of this page, and Godet recognises them in English, French, German and Italian.
The ‘Machines’ sheet: one row per machine
Only the code and the type are required. Fill in the rest when you have the details to hand: the machine’s rating plate usually shows the serial number, year and weight.
- Code: a short, unique reference such as EX-01 or MX-03. It is what links each job to the right machine.
- Type: the kind of machine, for example Crawler excavator, Mini excavator, Wheel loader, Backhoe loader or Scissor lift.
- Weight (t), Make, Model and Year: enough to identify the machine without any doubt.
- Serial number and Number plate: useful for insurance, in case of theft and when you sell.
- Hours: the hour meter reading on the day you fill in the row.
- Notes: everything else, such as equipment, attachments or where the machine is kept.
The ‘Logbook’ sheet: one row per job
Every job gets its own row, however short. Four columns are required: the date, the machine (its code), the type of entry and the title. The others are what make the log genuinely useful when you need to cost a machine or track down a part.
- Date: the day of the job, for example 14.03.2026.
- Machine (code): the code from the Machines sheet, written the same way.
- Entry: Service, Safety check, Walk-around, Repair, Part or Note.
- Title and Details: what was done in a few words, then the detail (oils, filters, parts, observations).
- Hour meter (h): the hours at the time of the job. This is the most useful column for planning what comes next.
- Done by: the fitter, the workshop or the outside garage.
- Parts (cost) and Labour (cost): the two amounts on the invoice, kept separate.
- Downtime (h): the time during which the machine could not work.
- Repair status: Repaired, In progress or Waiting for parts, for repairs only.
- Part ref., Quantity and Supplier: so you can find a part and reorder it without searching.
A worked example: a 14-tonne excavator
Take a 14-tonne crawler excavator, coded EX-02. In the Machines sheet, its row reads EX-02, Crawler excavator, 14, its make, model, year, serial number and today’s hour meter reading, for example 4,520 h.
In the Logbook sheet, two rows tell the story of its last month. By recording the hour meter and the downtime every time, you can see how many hours separate services and what breakdowns cost: the basis of the construction equipment cost per hour.
- The 500-hour service: the date, EX-02, Service, the title ‘500 h service’, the details ‘Engine oil, oil filter, fuel filters, cab filter’, hour meter 4,500, the workshop under Done by, then the parts and labour amounts from the invoice.
- A hose repair: the date, EX-02, Repair, the title ‘Bucket cylinder hose replaced’, hour meter 4,512, 3 h of downtime, status Repaired, the hose part number, quantity 1 and the supplier.
Keeping the log up to date
A template is only as good as the way it is kept. A few simple rules prevent most gaps in the history.
- Log the job on the same day, while the invoice or job sheet is still on the desk.
- Always record the hour meter, even for a small repair.
- Never delete a row: to correct a mistake, add a Note row that explains it.
- Keep a single master file, looked after by one person, and back up a copy every week.
- Put the invoice number in Details so the paperwork can be found again.
- Plan the next services from the construction equipment service intervals and the manufacturer’s manual.
The limits of a maintenance log in Excel
For a few machines and one person in charge, this template is enough. It falls short on three points that a file cannot fix on its own: it warns no one when a service is coming up, it sits on one computer while the information comes from site, and it keeps no record of a changed cell or a deleted row.
Our guide to the construction equipment maintenance log covers what to record and compares paper, spreadsheets and software. The one on the maintenance obligation explains what Art. 32b of the Swiss ordinance requires.
Importing the template into Godet
The template has exactly the columns Godet can read. When you move to a digital log, nothing needs retyping: in the garage, open the Excel menu, choose Import, then your file.
Godet shows a preview before writing anything: machines to create or update, jobs to add, and skipped rows with their number and the reason. A machine that already exists with the same code is updated, and a job already in the log is not added twice. You can try the import in the demo without an account: nothing is saved there.
Frequently asked questions
Is the template really free?
Yes. You download it without signing up and without giving an email address. You are free to use it, change it and share it.
Can I add my own columns?
Yes, wherever you like, as long as you do not rename the existing columns. On import, Godet reads the columns it recognises and ignores the rest.
Is an Excel maintenance log enough for Art. 32b of the Swiss ordinance?
The ordinance requires work equipment to be maintained according to the manufacturer’s instructions and the results of maintenance to be recorded; it does not prescribe any particular software. A complete, dated and up-to-date spreadsheet can serve as a record. Its weak point: a row can be changed or deleted without trace, which weakens the evidence in a dispute.
Which date and number formats work?
A proper Excel date is the safest choice. On import, Godet also reads 14.03.2026, 14/03/2026 and 2026-03-14. Numbers may include an apostrophe (6’842) and amounts a currency (CHF 420).
Read next
- The construction equipment maintenance log
- The construction equipment maintenance obligation in Switzerland
- Construction equipment rental software: bookings, check-out and check-in
- Excavator and construction equipment service intervals
- Construction equipment cost per hour: how to work it out
- Annual safety inspection: MEWPs, forklifts and cranes